- Voulez-vous créer un nouveau compte?
- Si vous avez oublié votre identifiant ou votre mot de passe, nous vous renverrons un nouveau mot de passe.
- Vous n'arrivez pas à vous connecter? Lisez la FAQ pour résoudre le problème.
Website redesign status 2012-02-20
Soumis par rfay le lun, 2012-02-20 14:13
- Progress
- Josh completed all of the wireframes.
- Randy and Josh met for a first time with a weekly Skype session. Anybody is welcome to join us for these, Saturday mornings at 8am US MT (Notes)
- Set up an email address for the group interested in this stuff. If you're interested, just ask to be added to it.
- Plans
- Everybody interested must review the wireframes early this week. Please concentrate on information or features that ought to be included or omitted. (link to master doc). You can comment on the master doc, or if you'd rather, comment here.
- What's missing in the current wireframe?
- What would we love to have there that's not there yet?
- What info could be dropped?
- After wireframe approval, Josh will procede with 3 photoshop mockups. Let's get those reviews done as soon as possible.
- Randy will update Warmshowers code to current D6 versions and hope for the best. This will give us a reasonable codebase to work with. This should mostly only affect core and contrib modules.
- Next skype meeting Saturday (
)
- Everybody interested must review the wireframes early this week. Please concentrate on information or features that ought to be included or omitted. (link to master doc). You can comment on the master doc, or if you'd rather, comment here.
»
- Vous devez vous identifier ou créer un compte pour écrire des commentaires



